NEW state-of-the-art footbridges have been introduced across North Yorkshire that are built to last generations.

When replacing damaged timber bridges, North Yorkshire County Council has been sourcing those made of a Fibre Reinforced Polymer (FRP) material which is widely used in boat and car manufacturing.

Read more: Teenage BMX rider from the region picked for 2022 World Championships

A deciding factor is the 120-year plus design life; almost five or six times the expected life of steel.

The FRP bridges are anti-slip, won’t rot or break and require very little maintenance.

They are made in Holland and have been used on nationwide design projects.

Although some firms in England use the material, none currently supply the type of single span bridges the County Council is looking for.

The first FRP footbridge in North Yorkshire was installed in Bird Ridding, Leyburn, in 2016 after the trees damaged the lightweight steel frame footbridge and it became rotten with the supporting joints severely damaged.

County Councillor Don Mackenzie, executive member for access, said: “At the time FRP bridges became a viable option as the long-term costs compare very well with the cost of a steel bridge.

“Unlike steel bridges they do not require a lot of maintenance; they don’t need painting every 25-years, are resistant to even the most extreme weather conditions and only require occasional cleaning.

“The first bridge in Bird Ridding was well-received by the local community as each bridge is designed to suit the location.

"It shows that we are being forward-thinking in sourcing these future-proof bridges which fit very well in North Yorkshire’s conservation areas.”

Other FRP bridges followed in Sandsend near Whitby and in Low Faggergill in the Yorkshire Dales to replace a flood-damaged bridge.

Read more: Only one in 10 North Yorkshire Police investigations leads to prosecution

The old footbridge on Low Green in Great Ayton was also replaced with an FRP alternative as the council's bridges team could install a single span bridge which is in-keeping with other wooden bridges downstream and does not need painting during its lifetime.

Cllr Mackenzie added: "There are many practical benefits in the use of FRP for certain of our bridges.

"It provides a very strong structure but is much lighter than steel.

"It is easier to handle and lift, saving time and money on construction costs, especially in remote areas.

"We will continue to ensure that each new or replacement bridge is in keeping with the local environment.

"We are confident that the FRP bridges will stand the test of time and provide appealing structures for everyone who uses them.”

Keep up to date with all the latest news on our website, or follow us on Facebook, Twitter and Instagram.

You can also follow our dedicated North Yorkshire Facebook page for all the latest in the area by clicking here.

For all the top news updates from right across the region straight to your inbox, sign up to our newsletter here.

Have you got a story for us? Contact our newsdesk on newsdesk@nne.co.uk or contact 01325 505054